OverviewTwo high-capacity Goliath gantry cranes engineered for heavy shipyard lifting and full compatibility with the existing site infrastructure. Each unit is rated at 800 tons SWL with tandem lifting capability up to 1600 tons, optimized for large block handling in shipbuilding.
Project constraints- Delivery deadline: two fully operational gantry cranes within 24 months
- Bridge span: 118 meters, requiring advanced structural design and stiffness control
- Safe Working Load (SWL): 800 tons per crane
- Infrastructure limitation: full compatibility with existing rails to avoid new foundations and related permitting
- Zero disruption requirement: shipyard operations must remain fully uninterrupted during construction and installation
Design features- Rail-mounted Goliath (gantry) cranes customized to the existing shipyard layout
- Truss girder bridge structure to reduce steel weight and minimize wind loads
- Winches installed on lower beams to lower the centre of gravity and improve stability
- Tandem lifting capability up to 1600 tons to handle large blocks and ship assemblies
Performance summary- Rated capacity: 800 tons SWL (each crane)
- Tandem operations: up to 1600 tons combined lift
- Bridge span: 118 m
- Rail interface: compatible with existing rails; no new foundations required
- Operational continuity: engineered for installation with minimal or no disruption to shipyard workflow
Project data (table)Location: Monfalcone
Equipment type: Gantry crane
Capacity: 800 t
Industry: Shipyard
Technical specifications- Type: Rail-mounted Goliath (gantry) cranes
- Rated capacity: 800 tons SWL per crane
- Tandem lifting capacity: up to 1600 tons combined
- Bridge span: 118 m
- Bridge structure: truss girder
- Winch placement: winches on lower beams to lower centre of gravity
- Rail interface: compatible with existing rails (no new foundations required)
- Delivery time requirement: full operation within 24 months
- Installation constraint: designed for zero/minimal disruption to shipyard operations